Jobs with Startups
JobsStartupsInvestorsMCP
JobsxAI

Construction Scheduler - Memphis

xAI logo

xAI

AI

Construction Scheduler - Memphis

Southaven, MS; Memphis, TN; Memphis, TN; Southaven, MS
On-site
Full-time
Posted Sep 18, 2026
Apply on company site

Opens the original job posting

Data Center
On-site

SpaceXAI’s mission is to create AI systems that can accurately understand the universe and aid humanity in its pursuit of knowledge. Our team is small, highly motivated, and focused on engineering excellence. This organization is for individuals who appreciate challenging themselves and thrive on curiosity. We operate with a flat organizational structure. All employees are expected to be hands-on and to contribute directly to the company’s mission. Leadership is given to those who show initiative and consistently deliver excellence. Work ethic and strong prioritization skills are important. All employees are expected to have strong communication skills. They should be able to concisely and accurately share knowledge with their teammates.

ABOUT THE ROLE:

Develop, maintain, and communicate construction schedules that the field, subcontractors, and leadership can actually use. You will build CPM baselines, update them from real progress, flag risk early, and explain schedule impact of changes, delays, and recovery plans. This is not a data-entry role. You need enough means-and-methods knowledge to challenge a sequence that will not work in the field.

Superintendents run the work; project managers own cost and contracts; the scheduler is the person who can tell you what is actually driving the end date, what slips if a trade is late, and whether a recovery plan is real.

RESPONSIBILITIES:

  • Build baseline CPM schedules from drawings, specs, estimates, bid packages, and construction sequences (WBS, activity coding, logic, calendars, and constraints used sparingly and correctly).
  • Maintain the live schedule: collect progress from superintendents, project managers, and trades; update percent complete, remaining duration, and logic; publish a clean current-period update on a set cadence (typically weekly look-aheads and monthly official updates).
  • Own the critical path. Identify near-critical work, float erosion, and out-of-sequence progress. Tell the team why the end date moved, not just that it did.
  • Produce three-week (or similar) look-aheads that match the master schedule and what the field can actually crew.
  • Analyze schedule impact of RFIs, change orders, design late-outs, access constraints, long-lead procurement, weather, and labor shortages. Prepare time-impact analyses (TIA) and what-if, recovery, and acceleration scenarios.
  • Coordinate with project managers, superintendents, estimators, procurement, design, owners/CMs, and subcontractors so the schedule reflects committed dates, not wishful ones.
  • Resource-load and, where required, cost-load the schedule. Flag crew stacking, craft shortages, and unrealistic production rates.
  • Prepare narratives, variance reports, S-curves, histograms, and executive summaries for internal reviews and owner/CM submittals.
  • Support claims and delay documentation with contemporaneous records (as-planned vs. as-built, fragnets, delay categorization) when needed.
  • Enforce schedule standards: naming, coding, update process, backup, and version control so the file remains auditable.
  • Facilitate or support pull-planning / Last Planner sessions and convert those commitments into logic in the CPM model.
  • Visit the site regularly. A scheduler who never walks the job will be wrong.

BASIC QUALIFICATIONS:

  • 4+ years of construction scheduling on active projects (GC, CM, owner’s project controls, or specialty contractor).
  • 4+ years of experience using Oracle Primavera P6 and comfortability with multiple calendars, relationship types, filters, layouts, global vs. project data, and schedule quality checks (open ends, negative float, SS/FF overuse, constraints). 
  • 4+years of experience with owner/CM specification-driven schedules (e.g., DCMA 14-point, USACE, or similar quality metrics).

PREFERRED SKILLS AND EXPERIENCE:

  • Bachelor’s in construction management, civil engineering, or a related field — or equivalent field experience.
  • PSP (AACE), PMI-SP, PMP, CCM, or similar credential.
  • Experience with owner/CM specification-driven schedules (e.g., DCMA 14-point, USACE, or similar quality metrics).
  • Forensic delay analysis, time-impact analysis, and claims support.
  • Cost/resource loading, earned value, and integration with cost systems.
  • Last Planner / pull planning; BIM 4D (Navisworks, Synchro) is a plus.
  • Additional tools as applicable: Power BI, Smartsheet, Procore, Autodesk Construction Cloud. 

ADDITIONAL REQUIREMENTS:

  • Willing to work extended hours as needed, including the current 6-day / 12-hour construction cadence.
  • Must be comfortable working in a fully onsite environment. 

SpaceXAI is an equal opportunity employer. For details on data processing, view our Recruitment Privacy Notice.

Apply for this role
xAI logo

xAI

Company profile

AI research company focused on understanding the universe.

View xAI

Headquarters

San Francisco, CA, USA

Keep exploring

More roles at xAI

View all roles

Associate Asset Manager - Memphis

Data Center · Southaven, MS; Memphis, TN; Memphis, TN; Southaven, MS

Sr. Business Operations Manager

Sales · Tokyo, Japan

Sr. Model Engineer, Model Training

Model · Palo Alto, CA; Austin, TX; New York, NY; Seattle, WA; Austin, TX; New York, NY; Palo Alto, CA; Seattle, WA

Sr. Model Engineer, Post-Training & RL

Model · Palo Alto, CA

Sr. Model Engineer, Mid-training

Model · Palo Alto, CA

Jobs with Startups © 2026

Browse startupsBrowse jobsMCP guideAboutPowered by Supabase